{"id":728,"date":"2025-10-21T18:08:28","date_gmt":"2025-10-21T10:08:28","guid":{"rendered":"http:\/\/8.218.102.180:8080\/?post_type=product&#038;p=728"},"modified":"2026-03-23T03:24:55","modified_gmt":"2026-03-22T19:24:55","slug":"during-production-inspection","status":"publish","type":"product","link":"https:\/\/www.cseonsite.com\/?product=during-production-inspection","title":{"rendered":"During Production Inspection"},"content":{"rendered":"<p>Also known as In-Process Inspection, it can be done when 5%~10% of production is finished. If we can find problems at early production stage, it will give your supplier more time for rework and correction. It will cause less delay and helps you supervise if the production is on schedule or not.<\/p>\n<p><strong>What are included in a During Production Inspection?<\/strong><\/p>\n<ol>\n<li><strong>Collaborate with the client to:<\/strong><br \/>\nReview critical product specifications.<br \/>\nDefine key inspection criteria (excluding laboratory testing requirements).<\/li>\n<li><strong>Document &amp; Logistics Review:<\/strong><br \/>\nValidate terms and conditions of the Purchase Order (PO) and Proforma Invoice (PI), including Package details.<\/li>\n<li><strong>Coordination &amp; Inspection Arrangement:<\/strong><br \/>\nCoordinate with the factory to organize on-site inspection and, if necessary, arrange laboratory testing.<br \/>\nConduct product inspection at the factory according to Acceptable Quality Level (AQL) 2 sampling standards.<br \/>\nCount the quantity &amp; Package inspection<\/li>\n<li><strong>Reporting &amp; Documentation:<\/strong><br \/>\nPrepare a comprehensive inspection report inclusive of:<br \/>\nDimensional measurements<br \/>\nPhotographic evidence<br \/>\nQuality assessments<br \/>\nVideo recordings (where applicable)<\/li>\n<\/ol>\n","protected":false},"excerpt":{"rendered":"<p>During Production Inspection (DPI) \u2013 Proactive Manufacturing Quality Control Also called In-Process Inspection, DPI is a key quality measure conducted at 5%~10% production completion. It detects early issues, allowing suppliers rework time to minimize delays and track schedule adherence. We align on specs\/criteria, verify PO\/PI (including packaging), coordinate on-site inspections (AQL 2 standards) and lab testing if needed, with reports covering dimensions, photos, quality assessments and videos (as applicable) \u2013 delivering visibility, mitigating risks and ensuring on-time, consistent quality.<\/p>\n","protected":false},"featured_media":892,"template":"","meta":{"_themeisle_gutenberg_block_has_review":false},"product_brand":[],"product_cat":[29],"product_tag":[],"class_list":{"0":"post-728","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-inspection","8":"first","9":"instock","10":"virtual","11":"sold-individually","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/www.cseonsite.com\/index.php?rest_route=\/wp\/v2\/product\/728","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.cseonsite.com\/index.php?rest_route=\/wp\/v2\/product"}],"about":[{"href":"https:\/\/www.cseonsite.com\/index.php?rest_route=\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.cseonsite.com\/index.php?rest_route=\/wp\/v2\/media\/892"}],"wp:attachment":[{"href":"https:\/\/www.cseonsite.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=728"}],"wp:term":[{"taxonomy":"product_brand","embeddable":true,"href":"https:\/\/www.cseonsite.com\/index.php?rest_route=%2Fwp%2Fv2%2Fproduct_brand&post=728"},{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/www.cseonsite.com\/index.php?rest_route=%2Fwp%2Fv2%2Fproduct_cat&post=728"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/www.cseonsite.com\/index.php?rest_route=%2Fwp%2Fv2%2Fproduct_tag&post=728"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}